Invest in the Next Generation of Energy Infrastructure.
Hyperscalers are pouring billions into data centers... but without advanced cooling, growth stalls.
Big Star’s hydro + immersion systems unlock capacity, slash OPEX, and scale fast.
Minimum Investment: $25,000
Raise: $1.2M
Investor Pool: 5% monthly gross revenue
The Trillion-Dollar Energy Crisis
AI/HPC power demand is doubling by 2030. Energy can eat 40% of OPEX. Whoever solves this wins the wave—Big Star is doing it now.

AI + HPC workloads doubling global power use by 2030

Cooling = margin maker/breaker (up to 40% of costs)

U.S. incentives + institutional capital are flooding the space
We're bringing the solution
to this.
We’re shipping modular infrastructure designed for speed—containers, immersion racks, and power systems that go from order to operation fast.
- 2.4MW Mobile Data Centers: Drop-in density for AI/mining farms
- ICT-100 (100kW) Immersion: Plug-and-play for next-gen workloads
- DLC Racks: Purpose-built thermal efficiency
- Transformers/Substations: Custom power—turnkey, accelerated
Immediate cash flow.
Massive upside.
Participate in monthly revenue now and ride the equity as we scale toward a listing. Limited allocation—moving fast.
Min: $25k
Raise: $1.2M
Cap: $21M post
Payouts: Immediate via 5% gross monthly revenue
ROI Cap: 125% revenue-share, then equity upside continues
Tax: Pass-through distributions
Exit: IPO or strategic acquisition in 6–9 months
Quarterly Projected Revenue: $6M across 16 countries.
The AI buildout is already underway.
Trillions are being deployed. Cooling and power decide who scales and who stalls, especially with transformer delays stretching 4–6 months.
$1T+ U.S. data-center spend (2025–2030)
Cooling drives margins at hyperscale
Turnkey providers with speed win the pipeline
Big Star sits at the intersection of AI, energy, infrastructure
Why we win.
Built to blitzscale.
Operators who’ve shipped in mining, AI, software, energy infrastructure and capital markets—now channeling that momentum into the hottest corner of infrastructure.
$10M → $700M+ operator; diversified revenue engines.
Bitmain U.S. facility; Hiveon U.S.; renewable immersion.
Steve Spanos
Ex-public-company CFO; E&Y/BDO rigor.
Growth + capital in energy/blockchain; demand gen at speed.
Ex-Dealerstack; founder of major mining MRO; product pipes.
Accredited (Reg D).
Immediate; share in 5% gross monthly revenue with quarterly cash.
125% ROI cap on revenue-share plus equity at exit.
$25,000.
IPO/NYSE-NASDAQ or strategic acquisition in 6–9 months.
Pass-through entity; tax-efficient distributions.
Market demand, supply chain, regulation, Bitcoin volatility—diversified model helps hedge.
Quarterly exec Zooms, direct leadership access, on-site tours (Burleson, TX).
Own a piece of the AI buildout before it peaks.
Big Star is already generating millions and removing the #1 bottleneck to AI scale. Limited allocation, immediate payouts, equity upside.

Important Disclosures & Risk Considerations
This website and related materials are intended solely for informational purposes and do not constitute an offer to sell or a solicitation of an offer to buy any securities. Any offer to invest will be made only through official offering documents and only to individuals who qualify as accredited investors under SEC Regulation D, Rule 506(c). All investments involve risk, including the possible loss of principal. Past performance is not indicative of future results. Prospective investors should consult with their financial and legal advisors before making any investment decisions.
Copyright 2025. Bigstar Blockchain. All Rights Reserved. | Privacy Policy